l Automation system, transmission line protection, transformer protection and circuit breaker protection for the first 1000kV UHV AC transmission project in China (Under-construction, no busbar exists).
l Transmission line protection, transformer protection and shunt reactor protection for Guanting Substation and Lanzhou Substation, the first 750kV UHV AC transmission project in China (No busbar exists).
l Automation system and protection system for the most of Olympic substation projects in Beijing, such as 500kV North City Substation, Bird-Nest Stadium, Water-Cubicle (National Swimming Stadium).
l Protection system for 2*1036MW generators in Haimen Power Plant of China Huaneng Group, which is the largest single generator unit in China.
l Protection system for 2*1000MW generators in Sanbaimen Power Plant of China Datang Group.
l On-line Wide Area Protection System for Fujian Power Grid Stability Control.
l Protection and control system for Three Gorges to Shanghai +-500kV HVDC project.
l Protection and control system for Shenzhou manned rocket launch in Jiuquan Satellite Launch Base in Northwest, China
|